EasyManuals Logo

Aastra AXD User Manual

Aastra AXD
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #310 background imageLoading...
Page #310 background image
AMT/PTD/PBX/0058/4/6/EN Installation and Maintenance Manual - Aastra 5000
Page 310 01/2011 Installation and activation
Hardware operations:
• Installing cabinets
• Handling cards.
Software operations:
• Starting and presetting the installation
• Accessing Aastra Management Portal (User interface).
• Massive import from the massive creation form.
6.2.1 Preliminary operations
6.2.1.1 Site inspection
To ensure that the system has the correct conditions to function properly, check the site
before you start installing the iPBX.
Here is a list of points to check:
• Location
• Environment
• Space requirement
• Electrical installation.
6.2.1.2 Location
• Unpacking, installation, operation, service, and storage
The location must be large enough to host the iPBX and a worktable. This table will be
used to install a telephone set, a management console, and all the other peripheral
equipment.
• Main distribution frame and battery
Check that there is sufficient space for the switching rack and battery no more than
4 meters from the iPBX cabinet. Both 5 m and 10 m RJ45 connection cables are
available.
Follow the supplier's instructions concerning the location of the battery.
• Minimum clearance
A minimum clearance is required for air circulation:
- 55 mm on the left side and at the back for AXD, AXL, AXS, AXS12 and AXS6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Aastra AXD and is the answer not in the manual?

Aastra AXD Specifications

General IconGeneral
BrandAastra
ModelAXD
CategoryServer
LanguageEnglish

Related product manuals