EasyManua.ls Logo

Abbott CELL-DYN 3200 - Page 214

Abbott CELL-DYN 3200
684 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-62
CELL-DYN
®
3200 System Operator’s Manual
9140181H—October 2001
Operating Instructions
Routine Operation
Section 5
Power OFF Procedure
It is not necessary to turn the system OFF under normal operating conditions. The
system should be turned OFF when certain maintenance procedures will be
performed, when the system will be moved, or when the system will be inactive for
an extended period of time (longer than 2 weeks).
For Maintenance
When certain tests or maintenance procedures require power to be OFF, use the
following procedure:
1. With the system still ON, perform any maintenance that is due.
2. Perform the Auto-Clean procedure in the SPECIAL PROTOCOLS menu. (If
necessary, refer to Section 9: Service and Maintenance; Subsection: Daily
Maintenance Procedures.)
3. When the Auto-Clean cycle is finished, press [DAILY SHUTDOWN]. When the
Daily Shutdown cycle is finished, the message STANDBY will be displayed
in the Status Box.
4. Turn the power switches OFF in the following order:
a. System (includes Analyzer, Data Module, and Sample Loader)
b. Display Monitor
c. Printer
NOTE: In an emergency situation, turn power OFF in any order as quickly
as possible.
For Extended Period
Additional procedures are required if the instrument will be inactive for an
extended period of time (more than 2 weeks), moved to a different location in the
lab, or shipped to a distant location. For detailed instructions, refer to
Intermediate-term Shutdown and Prolonged Shutdown later in this section.

Table of Contents

Related product manuals