CELL-DYN
®
3200 System Operator’s Manual
5-101
9140181H—October 2001
Section 5 Operating Instructions
Prolonged Shutdown
If the shutdown time is expected to exceed two weeks, follow the procedure below:
1. In the MAIN MENU, press [SPECIAL PROTOCOLS]
2. Press [AUTO CLEAN] to clean the instrument.
3. Press [PREPARE FOR SHIPPING]. Follow the instructions on the screen.
4. When the procedure is completed, turn the power OFF.
5. Remove the following tubing:
• Tubing in the Normally Closed Valves on the Flow Panel (refer to Figure
1.5).
• Tubing under the Peristaltic Pump.
6. Record this maintenance in your maintenance log.
CAUTION: Do not forget to reinsert the tubing securely in the Normally
Closed Valves and under the peristaltic pump before turning the instrument
back ON. Refer to Section 2: Installation Procedures and Special
Requirements; Subsection: Tubing Installation.
For the SL model, also refer to the Prolonged Shutdown Procedure in Section 13:
Sample Loader.
If the instrument will be shipped, refer to the instructions in Section 9: Service and
Maintenance; Subsection: Preparation for Shipping or Extended Period of Non-
Use.