Procedure
1. Loosen the two bolts (1) and (2).
2. Adjust the film roll holder vertically.
3. Tighten the two bolts.
GUID-D4BEC2B7-D94E-42A7-AE76-22623A106C5F-high.jpg [High]
Fig. 10
3.1.12 Spare Film Rolls
Before starting the procedure
There is storage for 12 film rolls, 6 on each side of the machine.
Procedure
1. Open the side covers of the machine.
2. Pull out the pin (2) and tilt the film roll holder
(1) to the front.
3. Put the film roll on to the film roll holder.
4. Tilt the film roll holder back and install the
pin.
5. Close the side covers.
GUID-F3AD93F5-A271-490C-A7A9-7A11FDC68847-high.jpg [High]
Fig. 11
3.1.13 Seal Plate (RPC 160 V)
Before starting the procedure
If moist silage is the primary baled crop the performance of the machine can be increased by the removal
of the seal plate.
Procedure
1. Start the tractor engine.
2. Use the controller to open the tailgate.
3. On the controller, push the button to start the feed channel floor.
GUID-221236B2-6CE6-492B-9D22-BF40DBE269A4 [V1]
GUID-A27435AB-C626-4E9D-8B81-93BF07425910 [V1]
3. Operation
Baler Wrapper Combination 75
4900.LE.EN01