EasyManua.ls Logo

ARCOMA PRECISION i5 - Page 171

ARCOMA PRECISION i5
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix B
Monthly Checklist
12.1.1.2 OTC
6. Power up the Ceiling suspended unit and check all
functions.
7. Move the Ceiling suspended unit around and observe
any irregularities.
12.1.1.3 Table
8. Move the Table in X, Y and Z direction an make sure it
runs smoothly and without any dissonance.
9. Move the Table top in longitudinal direction and check
that the mechanical end stops are not loose.
12.1.1.4 Wallstand
10.Move the Wallstand up and down in Z direction and make
sure it runs smoothly and sounds OK.
Operation Manual
1000-095-051-EN Rev. 1.1 ARCOMA AB
2020-06-16 Page 163 SWEDEN

Table of Contents