1 689 989 087 2018-07-24| Robert Bosch GmbH
68 | CRI/CRIN 848H | Initial startupen
25 - 30 Nm
2
3
458845-15_Pal
1
Fig. 28: Hydraulic connection on EPS 815
4.3 Fitting frame
4.3.1 EPS 708
1. Position the frame (Fig. 29, item 4) on the securing
pin (Fig. 29, item3) in the test area of the EPS 708.
2. Secure the frame with an M12 hexagon nut (Fig. 29,
item 1) and washer A12.4 (Fig. 29, item 2).
4
1
2
3
Fig. 29: Fitting on EPS 708