SECTION
5
CESSNA
PERFORMANCE MODEL
2088 (675 SHP)
CARGO POD INSTALLED
RATE
OF CLIMB-TAKEOFF
FLAP
SETTING
FLAPS 20"
CONDITIONS:
TAKEOFF POWER
-
-
1900
RPM
INERTIAL SEPARATOR-NORMAL
NOTE
1
5-26 U.S. Revision
23
1.
Do not exceed torque limit for takeoff per Engine Torque
for Takeoff chart. When ITT exceeds
765"C,
this power
setting is time limited to
5
minutes.
2. With climb power set below the torque limit, decrease rate of
climb by 20 FPM for inertial separator in BYPASS and 45 FPM
for cabin heat ON.
3.
Where rate of climb values have been replaced by dashes,
operating temperature limits of the airplane would be greatly
exceeded. Those rates of climb which are included, but the
operation slightly exceeds the temperature limit, are provided
for interpolation purposes only.
WEIGHT
LBS
PRESS
ALT
FT
CLIMB
SPEED
KlAS
RATE
OF
CLIMB-FPM
-zo.c
1
0%
1
ZO'C
I
40°C