SECTION
4
CESSNA
NORMAL PROCEDURES
MODEL
2088 (675 SHP)
STANDBY POWER CHECK
(If Standby Electrical System is Installed)
1.
Standby Power
-
CHECK (first flight of the day and before all
flights into known icing conditions).
A. Standby Power Switch
-
ON.
6.
Generator
-
LOAD to approximately 30 amps (use taxi lights if
required), but not more than 60 amps.
C.
VoltlAmmeter
-
SELECT ALT position and verify alternator
output near zero.
D.
Generator Switch -TRIP.
E.
VoltlAmmeter
-
CHECK for alternator output and voltage
approximately one volt less than with generator ON.
NOTE
A fully charged battery will carry part of the electrical load
when-in~tially switcning from generator to standby alternator
power because of the generator's higher voltage regulation.
F.
STBY ELECT PWR ON Annunciator
-
CHECK ON.
G. Generator Switch
-
RESET.
H.
STBY ELECT PWR ON Annunciator
-
CHECK OFF.
I.
VoltlAmmeter Selector Switch
-
RETURN to BATT position.
J.
Standby Power Switch
-
OFF (STBY ELECT PWR INOP
Annunciator
-
ON).
KNOWN ICING CHECK
(If Flight Into Known Icing Equipment Package is
Installed)
PREFLIGHT INSPECTION
1.
Windshield Anti-ice Panel
-
INSTALL. Check security and
electrical connection.
2.
Battery Switch
-
ON.
3. Wing Ice Detector Light Switch
-
ON and CHECK for illumination.
4.
DAYINIGHT Switch to NIGHT
-
Windshield Ice Detector Light (if
installed) CHECK for illumination.
5.
PITOTISTATIC and Stall Heat Switches
-
ON (for 30 seconds
max,mum, ensure p~tot covers are removed).
6.
LOW AIRSPEED ADVISORY SYSTEM (~f nstalled)
-
CHECK for
illum nation when pitot hear s ON.
7.
PITOTISTATIC anb Stall Heat Switches
-
OFF.
(Continued Next Page)
Revision
23