CESSNA
MODEL 208B (675 SHP)
SECTION 5
PERFORMANCE
CARGO POD INSTALLED
RATE
OF
CLIMB
-
BALKED LANDING
FLAPS
30"
CONDITIONS:
TAKEOFF POWER
1900 RPM
INERTIAL SEPARATOR
-
NORMAL
NOTE
1.
Do not exceed torque limit for takeoff per
ENGINE
TORQUE FOR TAKEOFF
chart. When
ITT
exceeds
765-12,
this power setting is time limited to
5
minutes.
2. With climb power set below the torque limit, decrease rate of
climb by 15 FPM for inertial separator in BYPASS and 45 FPM
for cabin heat ON.
3.
Where rate of climb values have been re~la~ed bv dashes.
operating temperature limits of the airplane would be
greatly
exceeded. Those rates of climb which are included but the
-
I
Revision 23
-,
operation slightly exceeds the temperature limit are provided
for interpolation purposes only.
U.S. 5-31
WEIGHT
LBS
PRESS
ALT
FT
CLIMB
SPEED
Kl
AS
RATE
OF
CLIMB
-
FPM
-20'C
I
O'C
I
20°C
I
40%