3-POINT HITCH IMPLEMENT AND LOADER OPERATION
REMOVAL AND INSTALLATION OF 3-POINT
HITCH IMPLEMENT (INCLUDING CONNEC-
TION OF UNIVERSAL JOINT) ................................ 7-2
OPERATION FOR 3-POINT HITCH IMPLEMENT
MOUNTING COMPONENTS ................................... 7-4
ADJUSTMENT OF LIFT ROD ......................................................7-5
ADJUSTMENT OF TOP LINK ......................................................7-5
ADJUSTMENT OF CHECK LINK .................................................7-5
DISMOUNTING THE IMPLEMENT ..............................................7-6
DRAWBAR AND TRAILER ...........................................................7-6
INSTALLING PTO SHAFT ............................................................7-7
HANDLING LOADER ............................................... 7-10
FIXATION POINTS FOR FRONT END LOADER .....................7-11
DRIVING ON SLOPE ..................................................................7-12
JOYSTICK VALVE PORT (IF EQUIPPED) ................................7-16
HYDRAULIC BLOCK (IF EQUIPPED) .......................................7-16
OM_TD220(DK4220,4520,4720,5020,5320,5520,6020)-EN(USA)_07.indd 1OM_TD220(DK4220,4520,4720,5020,5320,5520,6020)-EN(USA)_07.indd 1 2023-09-22 오전 11:36:032023-09-22 오전 11:36:03