EasyManua.ls Logo

Daedong DK4520 - Page 153

Daedong DK4520
240 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
7
3-POINT HITCH IMPLEMENT AND LOADER OPERATION
REMOVAL AND INSTALLATION OF 3-POINT
HITCH IMPLEMENT (INCLUDING CONNEC-
TION OF UNIVERSAL JOINT) ................................ 7-2
OPERATION FOR 3-POINT HITCH IMPLEMENT
MOUNTING COMPONENTS ................................... 7-4
ADJUSTMENT OF LIFT ROD ......................................................7-5
ADJUSTMENT OF TOP LINK ......................................................7-5
ADJUSTMENT OF CHECK LINK .................................................7-5
DISMOUNTING THE IMPLEMENT ..............................................7-6
DRAWBAR AND TRAILER ...........................................................7-6
INSTALLING PTO SHAFT ............................................................7-7
HANDLING LOADER ............................................... 7-10
FIXATION POINTS FOR FRONT END LOADER .....................7-11
DRIVING ON SLOPE ..................................................................7-12
JOYSTICK VALVE PORT (IF EQUIPPED) ................................7-16
HYDRAULIC BLOCK (IF EQUIPPED) .......................................7-16
OM_TD220(DK4220,4520,4720,5020,5320,5520,6020)-EN(USA)_07.indd 1OM_TD220(DK4220,4520,4720,5020,5320,5520,6020)-EN(USA)_07.indd 1 2023-09-22 오전 11:36:032023-09-22 오전 11:36:03

Table of Contents

Related product manuals