D 4.6 10
D_4.6_01_GB.fm 10-38
- Switch the conveyors on.
The limit switches for the conveyors
(89) or (89ao) must switch off when
the material has reached the area be-
neath the auger crossbeam.
- Check that the material is conveyed
properly.
Manually switch on or off the conveyor
if the material is not conveyed properly
until a sufficient amount of material
lies in front of the screed.
F0114_A1.EPS/Ultra3.EPS
89
89a