E 01 17
E_01_GB.fm. 17-18
4 Screed
The operating instructions for the screed cover all work required for mounting, setting
up and extending the screed.
5 Electrical connections
Establish the following connections when the mechanical components have been
mounted and set up:
5.1 Remote controls
to socket (15) (on the screed).
5.2 Grade control
to socket (16) (on the remote control
unit)
5.3 Auger limit switches
to socket (17) (on the remote control
unit)
5.4 Working lights
to sockets (18) (on the paver finisher).
Socket.bmp
17
15
F0119_A1.TIF
16
17
F0124_A1.TIF
18