C 1.1 6
C_1.1_01_GB.fm 6-14
3Transportation
m
Reduce the paver finisher and the screed to their basic widths; also remove any at-
tached side plates.
3.1 Preparations
- Prepare the paver finisher for transportation (see chapter D).
- Remove all protruding or loose parts from the paver finisher and the screed (see
also the operating instructions of the screed). Store these parts in a safe place.
f
When screed is operated with the optional gas heating
system:
- Remove the gas bottles of the screed heating system:
- Close the main shut-off valves and the bottle valves.
- Turn off the valves on the bottles and remove the gas
bottles from the screed.
- Transport the gas bottles on a second vehicle; heed all pertaining safety regula-
tions.