F 10.0 3
F_10.0_01_GB.fm. 3-6
2 General observation
The daily practice includes the walk around the machine with checking the following
items:
- Are there injuries on the parts or control elements?
- Are there leaks on the engine, the hydraulics, the gear box, etc.?
- Are all the locking points secure (conveyor, auger, screed)?
m
Repair the detected faults immediately in order to avoid risks of accidents and envi-
ronmental pollution!
3 Checks by a specialist
A
Subject the paver finisher, the screed and the optional gas or electric operated equip-
ment to checks by a specialist
- as required (according to the circumstances of application and operating condi-
tions),
- however, minimum once a year, so that the machine retains its reliable operating
condition.