C 1.1 11
C_1.1_01_GB.fm 11-14
- Release lock nut (2), screw threaded
dowel (3) into pump as far as possible
and secure with lock nut.
- Actuate lever (4) of hand pump until
sufficient pressure has been built up
and traction system brakes have been
released.
- Attach the tow bar to the coupling (5)
located in the bumper.
A
Now carefully and slowly tow the paver
finisher out of the construction area.
m
Always only tow the shortest distance to
the means of transport or the next park-
ing possibility.
Pump.eps
4
3
2
X