EasyManua.ls Logo

Dynapac F6C - Operation; Preparing for Operation; Required Devices and Aids; Before Starting Work (in the Morning or When Starting Paving)

Dynapac F6C
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D 31
D F6C.GB 31-50 0504
3 Operation
3.1 Preparing for operation
Required devices and aids
To avoid delays on site, check before starting work whether or not the following de-
vices and aids are present:
- Wheel loader for transporting heavy extendable parts
- Diesel fuel
- Engine oil and hydraulic oil, lubricants
- Separating agents (emulsion) and manual injector
- A full propane gas bottle (screed with gas heater system)
- Shovel and broom
- Scraper (spatula) for cleaning the auger and the hopper infeed area
- Parts that may become necessary for extending the auger
- Parts that may become necessary for extending the screed
- Percentage spirit level and levelling rail, +4 m long
- Levelling wire
- Protective clothing, signal vest, gloves, ear protection
Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment.
- Take an inspection walk around the paver finisher and check for leaks and damag-
es.
- Install parts removed for transportation or for the night.
- If the screed is optionally operated with a gas heater system, open the bottle valve
and the gas heater system’s shut-off valve.
- Carry out a check according to the following „Check list for the machine operator“.

Table of Contents

Related product manuals