3 Operation
3.1 Preparing for operation
Required devices and aids
To avoid delays on site, check before starting work whether or not the following de-
vices and aids are present:
- Wheel loader for transporting heavy extendable parts
- Diesel fuel
- Engine oil and hydraulic oil, lubricants
- Separating agents (emulsion) and manual injector
- A full propane gas bottle (screed with gas heater system)
- Shovel and broom
- Scraper (spatula) for cleaning the auger and the hopper infeed area
- Parts that may become necessary for extending the auger
- Parts that may become necessary for extending the screed
- Percentage spirit level and levelling rail, +4 m long
- Levelling wire
- Protective clothing, signal vest, gloves, ear protection
Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment.
- Take an inspection walk around the paver finisher and check for leaks and damag-
es.
- Install parts removed for transportation or for the night.
- If the screed is optionally operated with a gas heater system, open the bottle valve
and the gas heater system’s shut-off valve.
- Carry out a check according to the following „Check list for the machine operator“.