D 44
D F6C.GB 44-50 0504
When work is finished
- Run the paver finisher empty and stop
it.
- Lift the screed: Move switch (1) to the
upper position and set switch (2) to
raise.
- Retract the screed parts to the basic
screed width and lift the auger. Where
applicable, completely extend the lev-
elling cylinders.
- Engage the screed transport safe-
guards (3).
- While operating the tampers at a low
speed, let any material residues drop
out.
Elemenrt1.cdr
1
2
F0083_A1.TIF
3