D 45
D F6C.GB 45-50 0504
- Set the drive lever (4) to the centre po-
sition and the speed adjuster (5) to
minimum.
- Switch off the ignition (6).
- Switch the screed heater system off.
- If the screed is optionally operated
with a gas heater system, close the
main shut-off valve and the bottle
valve.
- Remove the levelling units and stow
them away in the boxes; close flaps.
- Remove all parts that extend beyond
the paver finisher contour or secure
them if the paver finisher is to be trans-
ported over public roads on a low-bed
trailer.
- Check the operating hour meter (7) to
determine whether maintenance work
must be performed (see chapter F).
- Cover and lock the operating panel.
- Remove material residues from the
screed and the paver finisher and
spray all parts with separator fluid.