D 43
D F6C.GB 43-50 0504
3.7 Interrupting/terminating operation
During breaks (e.g. delays caused by
material trucks)
- Determine the approximate duration.
- When material cooling to below the
minimum paving temperature is to be
expected, run the paver finisher empty
and create an edge like the end of a
layer.
- Set the drive lever (1) to the centre po-
sition.
During longer breaks
(e.g. lunch break)
- Set the drive lever (1) to the centre po-
sition and the speed adjuster (2) to
minimum.
- Switch off the ignition (3).
- Switch the screed heater system off.
- If the screed is optionally operated
with a gas heater system, close the
bottle valve.
The screed must be heated up to the
correct paving temperature before pav-
ing my be restarted.
START
ON
OFF
Gas_F6C.jpgElemenrt2_F6C.cdr
1
2
3