D 37
D F6C.GB 37-50 0504
3.3 Preparations for paving
Separating agent
Spray the parts coming into contact with
asphalt (hopper, screed, auger, push
roller) with a separator emulsion.
$
Do not use diesel fuel as it dissolves the
bitumen (prohibited in Germany!).
Screed heater system
Switch on the screed heater approx. 15–30 minutes (depending on the ambient tem-
perature) before paving begins. Warming up prevents the material from sticking to the
screed plates.
Direction marks
To ensure straight paving, a direction
mark must be present or established
(road edge, chalk lines or similar).
- Slide the operating panel to the de-
sired side and secure it.
- Swivel out and adjust the direction in-
dicator.
F0147_A1.TIF
DF65C.wmf