EasyManuals Logo

Ecolab EcoAdd User Manual

Ecolab EcoAdd
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #113 background imageLoading...
Page #113 background image
7.9.14.1.3 Max. metering phase
Fig. 71: Configuration: Max. metering phase
[Max. metering phase] - select:
1.
[Main menu] :
Ä
Chapter 7.6 ‘Main menu’ on page 66
2.
[Configuration menu] :
Ä
Chapter 7.9 ‘Overview - Configuration’ on page 83
3. Use the scrollbar to scroll to the [Oval gear meter] menu option.
4. [Oval gear meter] - select
ð
Screen switches to the [Oval gear meter].
5. [Max. metering phase] - select.
ð
Screen change for setting: [Max. metering phase]
6. Enter the seconds before the decimal point with the scrollbar
.
7. Select the seconds after the decimal point.
8. Enter the seconds with the scrollbar
.
9.
Press the button.
ð
The setting is saved, and the screen switches back to the [Oval gear meter]
.
10.
Press the button.
ð
The setting is saved, and the screen switches back to the configuration overview
.
11.
Pressing the button returns to the [Main menu].
12.
Pressing the button returns to the [Operating display].
Control / software
113 Rev. 2-05.2018

Table of Contents

Other manuals for Ecolab EcoAdd

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ecolab EcoAdd and is the answer not in the manual?

Ecolab EcoAdd Specifications

General IconGeneral
BrandEcolab
ModelEcoAdd
CategoryWater Pump
LanguageEnglish

Related product manuals