6.3.1 Hydraulic installation
Personnel:
n
Mechanic
n
Service personnel
n
Specialist
Installation diagram
1 Overflow valve
2 Pressure control valve
3 Option: Multi-function valve (MFV)
4 Suction pipe or bottom admission valve
D Pressure valve
P Pump head
S Suction valve
Overflow valve and and pressure control valves , (Pos. 1 and Pos. 2) may be
replaced by a multi-function valve (MFV) (Pos. 3) from our range which
combines all these functions.
Assembly, installation, modification and upgrades
43 Rev. 2-05.2018