The JIB consists of the following components:
(1) JIB boom
(2) JIB cylinder
(3) JIB extension
(4) JIB extension cylinder
(5) JIB manual extension [option]
(6) JIB support / JIB long support [option]
Add-on lifting accessories [option]
Add-on lifting accessories are placed between the boom tip
and the load (e.g. brick grapple, rotator) or on the crane
(e.g. hoist).
Hooks [option]
Different hooks can be mounted depending on the crane
model.
DANGER
Never exceed the maximum permissible loading of the hook.
Separate lifting accessories [option]
Separate lifting accessories, help to make or use a slinging
device: shackles, eye-bolts etc.
Structure and parts of the crane
EFFER 265-315-395-525 Progress 2.0 CE 15