EasyManua.ls Logo

Effer 265 - Lubrication Schedule; Central Greasing System [Option]

Default Icon
166 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.4.2. Lubrication schedule
8.4.3. Central greasing system [option]
CAUTION
It is really important to make sure that the system works correctly. The central
greasing system also needs maintenance.
This system has all the greasing points of the column, 1st boom and 2nd boom collected in a
centralised manifold. It does not include the stabiliser system, the slewing bearing and the boom
extensions.
Lines, Fittings, Manifolds, Injectors
Unfold the crane and do an inspection for broken plastic piping or damaged connectors and fittings.
CAUTION
The use of the wrong grease will void the customer’s warranty and compromise
the correct operation of the system. Refer to the section “General greasing of the
cranes”.
Maintenance and Service
152 EFFER 265-315-395-525 Progress 2.0 CE

Table of Contents

Related product manuals