Levelflex FMP55 HART Electrical connection
Endress+Hauser 51
1. Screw back firmly connection compartment cover.
2. Turning securing clamp 90 ° counterclockwise and tighten the clamp with
2.5 Nm (1.84 lbf ft) again using the Allen key (3 mm).
7.3 Post-connection check
Is the device or cable undamaged (visual check)?
Do the cables comply with the requirements ?
Do the cables have adequate strain relief?
Are all cable glands installed, securely tightened and leak-tight?
Does the supply voltage match the specifications on the nameplate?
Is the terminal assignment correct?
If required: Has protective ground connection been established ?
If supply voltage is present, is the device ready for operation and do values appear on the display
module?
Are all housing covers installed and securely tightened?
Is the securing clamp tightened correctly?