EasyManua.ls Logo

Epson TM-U375 - Page 101

Epson TM-U375
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-15
Sub-assembly H
Assembly
Step
3
4
5
6
7
8
Assembly ProcedurePart Name
V holding roller shaft
Roller-Holding (small)
Roller-Holding (large)
Guide-Slip paper
Spring-J insertion lever B
Lever-J insertion
RE (2.0) x 1
Insert the Roller-Holding (large) and Roller-Holding (small) onto
the V holding roller shaft. Make sure that the flat surface of the
rollers faces inward.
Place both ends of the V holding roller shaft to grooves C of the
Guide-Slip paper; then push the shaft until it clicks.
<Checkpoints>
Make sure that the flat side of the Roller-Holding (large) and (small)
face inward.
Attach the Spring-J insertion lever B to shaft D of the Guide-Slip
paper.
Attach the Lever-J insertion to shafts D and E of the Guide-Slip
paper.
Attach the E-ring to shaft D. Make sure that the Spring-J insertion
lever B is in position as shown in the extended illustration.
<Checkpoints>
Make sure that the Spring-J insertion lever B is positioned properly.
CONFIDENTIAL

Table of Contents

Other manuals for Epson TM-U375

Related product manuals