EasyManua.ls Logo

Epson TM-U375 - Linked Lever, and Fulcrum Shaft a and B Attachment

Epson TM-U375
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-25
Assembly
Step
Assembly ProcedurePart Name
Main Assembly 2 Linked Lever, and Fulcrum Shaft A and B Attachment
1
2
3
4
5
(6)
Fulcrum shaft B
RE (2.3) x 1
Linked lever spring
Linked lever
Fulcrum shaft A
RE (2.3) x 1
Platen holder spring
(Linked lever spring)
Insert Fulcrum shaft B from inside the Platen holder unit and fasten
the shaft with the E-ring.
Place the Linked lever spring inside the Linked lever; then place
portion A in groove B.
Pass Fulcrum shaft A from inside the Platen holder unit through the
Linked lever and Linked lever spring; then attach the E-ring to the
shaft.
Attach the Platen holder spring to shaft C, and lock it with dowel D
of the Linked lever.
Hook the catch of the Linked lever spring on portion E.
CONFIDENTIAL

Table of Contents

Other manuals for Epson TM-U375

Related product manuals