EasyManua.ls Logo

Epson TM-U375 - Solenoid-Platen Switching and Tension Lever Assembly Attachment

Epson TM-U375
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-29
Main Assembly 6 Solenoid-Platen Switching and Tension Lever Assembly Attach-
ment
Assem-
bly Step
Assembly Procedure
Align the shaft of the Solenoid-Platen switching with the U-shaped
notch of the Linked lever; then provisionally tighten the screw in hole
A. (Final tightening is done in
Adjustment C
performed in
Main
Assembly 14
.)
Attach the Tension pulley to the C feed belt.
Attach the Tension lever assembly to the Main frame assembly, and
provisionally fasten the Tension lever assembly and Solenoid-
Platen switching with the screw. (Final tightening is done in
Adjust-
ment B
performed in
Main Assembly 14
.)
<Checkpoint>
Make sure to attach the Solenoid-Platen switching so that the lead
wires face front of the printer.
Solenoid-Platen switching
CC (M3 x 6) x 1
Tension lever assembly
CC (M3 x 6) x 1
1
2
Part Name
CONFIDENTIAL

Table of Contents

Other manuals for Epson TM-U375

Related product manuals