GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5 VIVID E9 S
ERVICE
M
ANUAL
3 - 20 Section 3-7 - Completing the setup
Section 3-7
Completing the setup
3-7-1 Purpose of this section
This section describes how to complete the installation of VIVID E9.
3-7-2 System specifications
3-7-2-1 System requirements verification
• Verify that the site meets the requirements listed in Chapter 2 (see: "Facility needs" on page 2-9).
• Verify that the specifications below don’t conflict with any on-site conditions.
3-7-2-2 Physical dimensions
The physical dimensions of the VIVID E9 unit are summarized in Table 3-10.
3-7-2-3 Mass with monitor and peripherals
3-7-2-4 Acoustic noise level
Less than 55 dB(A) at 20 degrees Celsius, measured in the operators head position, 20 cm in front of
the keyboard’s right corner, at 1.30 m above the floor, and in a distance of 1 meter at all four sides, 1
meter above the floor.
Table 3-10 Physical dimensions of VIVID E9 with monitor and peripherals
HEIGHT WIDTH DEPTH UNIT
137.5/157.5 54.0 80.0 cm
54.1/62.0 21.2 31.4 Inches
Table 3-11 Mass of VIVID E9 with monitor and peripherals
MODEL WEIGHT [KG] WEIGHT [LBS]
VIVID E9 128 283