EasyManua.ls Logo

GE Vivid E9

GE Vivid E9
802 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5 VIVID E9 S
ERVICE
M
ANUAL
8 - 102 Section 8-6 - Top Console Parts Replacement
8-6-7-3 Install the Upper OP Panel/Touch Panel Assembly (cont’d)
3.) Connect the following cables to the Operator Panel, Upper:
- Ribbon Cable from the Operator Panel, Lower
- Trackball Cable from the Operator Panel, Lower
- A/N Cable from the A/N Keyboard
- Power/On-Off switch (part of Main Cable) in position J23
- USB Cable 1 (part of Main Cable) in position J21
- USB Cable 2 (part of Main Cable) in position J22
- Bulkhead Board USB Cable 1 (from bulkhead position closest to the OP) in position J24
- Bulkhead Board USB Cable 2 (from bulkhead position most far from the OP) in position J25
NOTICE
Do not apply stretch on the Ribbon Cable. It stretched, the connector on Operator Panel, Lower may
break, resulting in a malfunction.
Figure 8-114 Cables on rear of Operator Panel, Upper
A/N CABLE FROM THE A/N KEYBOARD
TRACKBALL CABLE FROM THE OPERATOR PANEL, LOWER
RIBBON CABLE FROM THE OPERATOR PANEL, LOWER.
BULKHEAD BOARD USB CABLE 1 (J24)
BULKHEAD BOARD USB CABLE 2 (J25)
USB CABLE 1 (J21)
USB CABLE 2 (J22)
POWER ON-OFF SWITCH (J23)

Table of Contents

Other manuals for GE Vivid E9

Related product manuals