GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5 VIVID E9 S
ERVICE
M
ANUAL
Chapter 8 - Replacement procedures 8 - 139
8-6-21-2 Lower Frame Assembly removal procedure
Follow these steps to remove the Lower Operator Panel Frame:
1.) Remove the 2 screws securing the Main Cable.
2.) Remove the 5 remaining screws securing the Bulkhead Bracket.
3.) Remove the Bulkhead Bracket.
4.) From underneath the Frame, pull the Main Cables through the Frame opening to free the Frame.
5.) Remove the Upper Frame.
6.) Remove two plastic Plate Washers on each side of the Bulkhead Bracket.
7.) Remove the Lower Operator Panel Frame.
Figure 8-151 Screw placement, Main Cable clamp
Figure 8-152 Screw placement, bulkhead bracket