EasyManua.ls Logo

GE Vivid E9

GE Vivid E9
802 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5 VIVID E9 S
ERVICE
M
ANUAL
8 - 240 Section 8-10 - Front End Processor (FEP) / Card Cage parts replacement
8-10-7-2 DRX Board removal procedure
Follow these steps to remove the DRX Board:
1.) Remove the DRX Shield.
2.) Pull out the DRX Board.
3.) Place it on an ESD safe place.
8-10-7-3 DRX Board installation procedure
Follow these steps to install the DRX Board:
1.) Carefully align the DRX Board with the rails and push it in till it is seated in the Back Plane
connectors.
2.) Install the DRX Shield.
3.) Install the FEP Cover and fasten it with its fixing screws.
4.) Plug in the PCIe (GFI) Cable.
5.) Install the cover for the PCIe cable.
6.) Install the Right Side Cover.
8-10-7-4 Calibration and adjustments
Calibrate the Front End as described in: Section 6-6 "DC Offset Calibration (Front End Alignment)" on
page 6-11.

Table of Contents

Other manuals for GE Vivid E9

Related product manuals