Fluent Pro Fluid Management System
English After Procedure 51
4.1.3.3 Remove the full Waste Bag from the Waste Bag Hooks and discard the Waste Bag according to facility
protocols.
Figure 61: Remove Full Waste Bag
4.1.4 Disassemble the Under-Buttocks Drape (UBD)
4.1.4.1 Disconnect the Out-FloPak tubing yellow connector from the Under-Buttocks Drape (UBD) Port.
Figure 62: Disconnect UBD
4.1.4.2 Dispose of the Under-Buttocks Drape (UBD) according to your facility’s protocol.
4.1.5
Disassemble the Hysteroscope
4.1.5.1 Clamp the hysteroscope Inflow Tube.
4.1.5.2 Remove the hysteroscope Inflow Tube.
4.1.5.3 Remove the hysteroscope Outflow Tube.
4.1.6
Disassemble the Fluent Pro In-FloPak
4.1.6.1 Clamp the Fluid Bag Tube.
4.1.6.2 Remove the spike from the Fluid Bag.