EasyManuals Logo

HP Integrity BL870c User's & Service Guide

HP Integrity BL870c
179 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
Verify Site Preparation
Verifying site preparation is an essential factor of a successful server installation, and includes the
following tasks:
Gather LAN information. Determine the two IP addresses for the Onboard Administrator
integrated Lights Out Management Processor (OA iLO 2) LAN and the server blade iLO 2
MP.
Establish a method to connect to the server console. For more information on console connection
methods, see Accessing the Integrated Lights Out 2 Management Processor (page 44).
Verify electrical requirements. Ensure that grounding specifications and power requirements
are met.
Confirm environmental requirements.
Inspect the Shipping Containers for Damage
HP shipping containers protect their contents under normal shipping conditions. After the equipment
arrives, carefully inspect each carton for signs of shipping damage. Shipping damage constitutes
moderate to severe damage, such as punctures in the corrugated carton, crushed boxes, or large
dents. Normal wear or slight damage to the carton is not considered shipping damage. If you find
shipping damage to the carton, contact your HP customer service representative immediately.
Unpack the Server
The following procedure describes how to unpack a server blade.
1. Use the instructions printed on the outside top flap of the carton.
2. Remove inner accessory cartons and the top foam cushions, leaving only the server.
IMPORTANT: Inspect each carton for shipping damage as you unpack the server.
3. Place the server blade on an antistatic pad.
Check the Inventory
The sales order packing slip lists all equipment shipped from HP. Use this packing slip to verify
that all equipment has arrived.
NOTE: To identify each item by part number, see the sales order packing slip.
Damaged Equipment Returns
If the equipment is damaged, immediately contact your HP customer service representative. The
service representative initiates appropriate action through the transport carrier or the factory and
assists you in returning the equipment.
Installing Additional Components
This section describes the installation of components that are not installed at time of delivery. If
your server blade has no additional components to install, see Chapter 4 (page 69).
Service Tools Required
Service of this product can require the IPF Processor Install Tool Kit.
The toolkit includes:
A disposable ESD Kit
a labelless processor installation tool (2.5 mm hex and Torx T-15 screwdriver)
Installing Additional Components 27

Table of Contents

Other manuals for HP Integrity BL870c

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP Integrity BL870c and is the answer not in the manual?

HP Integrity BL870c Specifications

General IconGeneral
BrandHP
ModelIntegrity BL870c
CategoryServer
LanguageEnglish

Related product manuals