20. Power up the server .
21. If removed, install the front bezel .
ResultsResults
The installation is complete.
Display port optionDisplay port option
SubtopicsSubtopics
Installing an 8 SFF display port/USB/optical blank optionInstalling an 8 SFF display port/USB/optical blank option
Installing the 4 LFF display port/USB optionInstalling the 4 LFF display port/USB option
Installing an 8 SFF display port/USB/optical blank optionInstalling an 8 SFF display port/USB/optical blank option
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
Phillips No. 1 screwdriver
ProcedureProcedure
1. If installed, remove the front bezel .
2. Power down the server.
3. If installed, open the cable management arm .
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack .
7. Place the server on a flat, level work surface.
8. Remove the access panel .
9. Remove the middle cover .
10. Remove the universal media bay blank.
Retain the screws and blank. These screws will be used to secure the new optical drive cage.