3. Connect all peripheral cables to the server.
4. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
5. Employ industry best practices in routing and managing the peripheral cables and power cords. Do one of the following:
Install the rack rail hoop-and-loop strap.
Install the cable management arm.
Hardware options installationHardware options installation
This chapter provides instructions for installing supported hardware options. To ensure proper server deployment and operation, Hewlett
Packard Enterprise recommends installing only HPE‑validated hardware options. To see the list of validated options for this server, see the
product QuickSpecs on the HPE ProLiant DL320 Gen11 Server website:
https://buy.hpe.com/us/en/p/1014696061https://buy.hpe.com/us/en/p/1014696061
To view the warranty for your server and supported options, see Warranty information.
SubtopicsSubtopics
Server data backupServer data backup
Hardware option installation guidelinesHardware option installation guidelines
Rack mounting optionsRack mounting options
Installing the front bezelInstalling the front bezel
Drive optionsDrive options
Installing the 8 SFF drive backplaneInstalling the 8 SFF drive backplane