NOTE:NOTE:
To make sure that the drive has installed successfully, make sure that the latch is engaged with the drive cage.
6. Determine the status of the drive from the drive LED definition .
7. Install the front bezel .
8. To configure drive arrays, see the relevant storage controller guide .
ResultsResults
The installation is complete.
Installing the 8 SFF drive backplaneInstalling the 8 SFF drive backplane
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Remove the server from the rack .
5. Place the server on a flat, level work surface.
6. Remove the access panel .
7. Remove the middle cover .
8. Remove the fans.
9. Remove the fan wall.
10. Remove the energy pack retention latch:
a. Pull up and hold the latch (callout 1).
HPE ProLiant DL320 Gen11 Server User Guide 84