25. If installed, close the cable management arm.
26. Power up the server .
27. If removed, install the front bezel .
ResultsResults
The installation is complete.
Installing the 4 SFF drive cageInstalling the 4 SFF drive cage
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
The components included with the hardware option kit
ProcedureProcedure
1. If installed, remove the front bezel .
2. Power down the server.
3. If installed, open the cable management arm .
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack .
7. Place the server on a flat, level work surface.