7. Install the M.2 air baffle .
8. Install the access panel .
9. Install the server into the rack .
10. If installed, close the cable management arm.
ResultsResults
The installation is complete.
Expansion card optionsExpansion card options
The server supports the installation of full-height, half-length and half-height, half-length (low profile) PCIe expansion / add-in (AIC) cards
such as: