For more information on these cabling requirements, see the documentation that ships with the option.
13. Install the riser cage.
14. Install the access panel .
15. Install the server into the rack .
16. Connect all peripheral cables to the server.
17. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
18. If installed, close the cable management arm.
19. Power up the server .
ResultsResults
The installation is complete.
Accelerator optionsAccelerator options
This server supports various accelerator options to meet your computational and graphics workload requirements. For a list of supported
accelerator models, see the server QuickSpecs on the Hewlett Packard Enterprise website (https://buy.hpe.com/us/en/p/1014696061https://buy.hpe.com/us/en/p/1014696061).
PCIe workload accelerators—These options are PCIe card–based, direct–attach solutions that use solid–state storage technology
directly on the PCI bus to boost I/O performance and reduce latency to scale in line with your processing requirements.
Computational and graphics accelerators—These options deliver accelerated compute performance for a range of deep learning, high–
performance computing (HPC), and graphics–intensive applications.
SubtopicsSubtopics
Installing an accelerator in the GPU riser cageInstalling an accelerator in the GPU riser cage