5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Remove the secondary riser cage.
9. Install the secondary riser board:
a. Attach the riser board to the cage (callout 1).
b. Install the riser board screws (callout 2).
10. Install the secondary riser cage.
11. Connect the cables to the system board .
12. Install the access panel .
13. Install the server into the rack .
14. Connect all peripheral cables to the server.
15. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
16. If installed, close the cable management arm.