Huawei RH2288H V3 - Unpacking the Chassis; Installing the Server

Huawei RH2288H V3
350 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Air lters installed on cabinet doors.
AC power supplied from the rear of the cabinet.
3.3 Unpacking the Chassis
The following tools must be available before the operation:
Protective gloves
ESD gloves or ESD wrist strap
Box cutter
Procedure
Step 1 Check whether the package and seals are in good condition.
NO TE
If the package is damaged (for example, the package is soaked or deformed, or the seals or
pressure sensitive adhesive tape is unsealed),
ll in the
Cargo Problems Feedback Form
.
Step 2 Use a box cutter to cut the pressure-sensitive adhesive tape on the package, and
open the package.
CA UTION
Exercise caution when using a box cutter to avoid personal injury or equipment
damage.
Step 3 Check the components against Table 3-2 and ensure that they are intact and free
from oxidation, corrosion, and damage.
Table 3-2 Shipped items
No.
Description
1 Documentation bag that contains a warranty card, and a Quick
Start Guide
2 A pair of guide rails
3 One rack server
----End
3.4 Installing the Server
This section describes how to install a server on L-shaped guide rails, adjustable
guide rails, and holding rails. Choose an installation method based on site
conditions.
Install a server if:
RH2288H V3 Server
User Guide 3 Installing and Removing the RH2288H V3
Issue 46 (2022-12-28) Copyright © Huawei Technologies Co., Ltd. 83