EasyManua.ls Logo

IBM System/360 20 - 039

IBM System/360 20
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
II
ASSGN
II
VOL
II
TPLAB
II
UPS
I
xxxxxxxx
II
EXEC
lxxxxxxx
xxxxlxx,x
1xxxlxxx
Reguired
for
any
sym-
bolic
address
whose
device
assign~ent
in
main
storage
is
to
be
changed.
Required
for
any
sym-
bolic
device
on
which
standard
label
checking
is
to
be
performed.
Required
for
standard
label
checking.
Must
follow
the
associated
VOL
statement.
Required
if
user
rou-
tines
are
present
andl
or
no
tape
mark
option
is
used.
Possible
operands:
For
user
routines
only.
For
no
tape
mark
option
only.
For
both
user
routines
and
no
tape
mark
option.
Required.
Any
other
job
control
statements
6
such
as
DATE, OPTN, LOG,
NOLOG,
or
FILES
state-
ments,
need
be
issued
only
if
the
corres-
ponding
functions
are
to
be
requested.
The
following
program
control
statements
are
used
with
the
file-to-file
Utility
programs:
II
U
(Utility
Modifier)
Optional.
II
FS
(Field-Select)
Optional.
II
H
(Print-Header)Optional
(for
Tape-to-
Printer
Utility
program
only)
II
END
Required.
The
following
program
control
statements
are
used
with
the
Initialize-Tape
Utility
program:
II
INITTP
VOLl -
VOL8
Required.
Required
if
the
operand
CARD
is
specified
in
the
INITTP
statement.
One
to
eight
statements
(called
volume-label
image
statements)
may
be
present
for
each
output
tape
specified.
II
END
USER
ROUTINES
Required
after
each
set
of
volume-label
image
statements.
If
the
user
wishes
to
include
his
own
rou-
tines,
the
assembled
routines
(one
integral
program)
must
be:
a)
inserted
in
the
Utility
program
deck
(see
Figure
11)
if
the
card-resident
system
is
to
be
used;
or
b)
placed
behind
the
program
control
cards
in
the
hopper
of
SYSBDB
if
the
tape-
resident
system
is
to
be
used.
The
first
two
cards
(Loader
and
Clear
Storage
card~)
of
the
user's
object
deck
must
be
removed.
The
last
card
(END
card)
remains
in
the
deck.
!he
user
must
supply
an
UFSI
control
statement
with
the
operand
1
(in
the
set
of
jcb
control
statements)
if
he
includes
his
own
routines.
The
tape
error
statistics
option
can
be
requested
by
including
a
II
CFTN
control
statement
during
the
preceding
Job
Control
run.
(280
bytes
of
main
storage
will
be
used)
.
PREPARATION
OF
THE
SYSTEM
The
following
steps
must
be
taken
to
pre-
pare
the
system
for
the
execution
of
a
uti-
lity
program.
1.
If
the
system
run
has
not
yet
been
initiated,
follow
the
procedure
described
in
the
section
l~g_~~rd=
]~sidell.L~'y.§.!g.!!!.
2.
Place
into
the
hopper
of
SYSRDR:
a)
the
card
Job
Control
program
deck
(if
required);
b)
the
cards
containing
the
job
con
trol
statements,
if
any,
between
phase
02
and
phase
03
of
the
Job
Control
program;
c)
the
deck
containing
phase
0
of
the
Utility
program;
d)
the
cards
containing
the
program
control
statements
for
the
Utility
program;
e)
the
deck
containing
phases
1-4
of
the
Utility
program;
f)
user
routines,
if
present;
g}
the
remainder
of
the
Utility-program
deck.
Use
of
Language
Translators
and
other
IBM-Supplied
Processing
Programs
39

Related product manuals