6 | Installation INFICON
136 / 319 074-594-P1H Micro GC Fusion Operating Man-
ual
21
Install a user-provided 1/8 in. sample line with the female Swagelok fittings
preinstalled.
22
Connect a vent line to the vent fittings using 1/8 in. Swagelok fittings. Run the
exhaust to a fume hood or other designated area for hazardous waste disposal.
23
Slowly open the dial to allow the sample to flow through the device. Check the
flow indicated on the flow gauge and set the limit to less than 100 mL/min.
24
Turn on Micro GC Fusion. The instrument is ready to perform an analysis.
CAUTION
If the flow rate through the device exceeds 100 mL/min, the output pressure
from the device to Micro GC Fusion may exceed the acceptable pressure
range, causing instrument damage.
WARNING
Safely vent carrier and sample streams - potentially toxic, noxious, asphyxiant
(oxygen displacing) or flammable gases - outside Micro GC Fusion and away
from the operating area. Vent toxic gases to a fume hood, chemical trap, or
reaction medium.