2MV
1-5-52
5. Remove three connectors from the
operation panel PWB main.
6. Remove the operation panel upper unit.
Figure 1-5-93
7. Remove all connectors and FFC from
the operatioon panel PWB main.
8. Remove four screws and then remove
the operation panel PWB main.
9. Check or replace the operation panel
PWB main and refit all the removed
parts.
Figure 1-5-94
Operation panel
upper unit
Connectors
Operation panel
PWB main
YC7
YC6
YC8
YC5
YC14
YC11
YC3
YC2
YC4
PWB connector
YC1
Screw
Screw
Screw
Screw
Operation panel
PWB main
Operation panel
upper unit