2MV
1-5-45
(2) Detaching and refitting the engine PWB
Procedures
1. Remove the rear cover.
(See page 1-5-5)
2. Remove fifteen screws and then
remove the controller box cover.
Figure 1-5-80
3. Remove five connectors and the FFC
from the main PWB.
4. Remove six wire holders and then
release the wires and the FFC.
5. Remove the connector of the controller
fan moutor from the main PWB.
6. Remove two hooks of the wire guide
and then remove the wire guide from
the controller box.
Figure 1-5-81
Screw
Screw
Screw
Screw
Screw
Screw
SCrew
Screw
Screw
Screws
Screws
Screw
Screw
Controller
box cover
Wire guide
Wire holders
Connector
Controller box
Hook
Hook
Connectors
FFC