EasyManua.ls Logo

LeeBoy 8515E - Every 100 Hour or Monthly Maintenance; Every 250 Hours or Quarterly Routine Maintenance; Every 500 Hours or Semi-Annual Routine Maintenance; Every 1000 Hours or Annual Routine Maintenance

LeeBoy 8515E
150 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5555
LeeBoy 8515E Conveyor Paver 5-7
Maintenance
Every 500 Hours or Semi-Annual Every 500 Hours or Semi-Annual
Routine MaintenanceRoutine Maintenance
1. Replace coolant. (Page 5-22)
2. Change engine oil and lter. (Page 5-18)
3. Change torque hub oil. (Page 5-11)
4. Replace engine belt. (Page 5-20)
5. Replace fuel lter. (Page 5-22)
6. Clean fuel water separator. (Page 5-23)
7. Change the hydraulic oil and lter. (Page 5-24)
8. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
Every 1000 Hours or Annual Every 1000 Hours or Annual
Routine MaintenanceRoutine Maintenance
1. Drain hydraulic tank and clean strainer. (Page
5-24)
2. Replace air lter. (Page 5-19)
3. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
Every 1500 HoursEvery 1500 Hours
1. Contact your authorized dealer to check, and
service if needed, the engine injector tip, PCV
(Positive Crankcase Ventilation) valve, and EGR
cooler.
2. Replace oil separator element. (Page 5-20)
3. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
Every 3000 HoursEvery 3000 Hours
1. Contact your authorized dealer to check, and
service if needed, the EGR system and turbo-
charger.
2. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
4. Drain fuel water separator (if needed). (Page 5-23)
5. Check torque hub oil level. Rell if needed. (Page
5-11)
6. Lubricate grease ttings on the ight screw on both
sides of the screed, the tting on the depth screw,
and the ttings on the ange bearings located on top
of the extension screed. Grease nuts on extension
screws. (Page 5-10)
7. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
Every 100 Hour or Monthly Every 100 Hour or Monthly
MaintenanceMaintenance
1. Check main engine belt. Adjust or replace if
needed. (Page 5-20)
2. Check and adjust conveyor drive chains. (Page
5-13)
3. Check and adjust conveyor ight chains. (Page
5-12)
4. Check auger drive chains, lubricate and adjust.
(Page 5-14)
5. Check and adjust screed extension top guide.
(Page 5-14)
6. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
Every 250 Hours or Quarterly Every 250 Hours or Quarterly
Routine MaintenanceRoutine Maintenance
1. Clean air lter. (Page 5-19)
2. Adjust engine belt. (Page 5-20)
3. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.

Table of Contents

Related product manuals