EasyManua.ls Logo

LeeBoy 8616B - Routine Maintenance

LeeBoy 8616B
287 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LeeBoy 8616B Conveyor Paver5-6
ROUTINE MAINTENANCE
Preparing Machine for
Maintenance
1. Park the paver on a at surface.
2. Lower all attachments to ground level.
3. Place joysticks in neutral.
4. Run engine at 1/2 speed (RPMs) without load for
three to ve minutes.
5. Reduce engine speed (RPMs) to slow idle.
6. Place ignition switch in the OFF position.
If any maintenance must be
performed while the engine is running, DO NOT leave
paver unattended.
Every 10 Hours or Daily Routine
Maintenance
1. Scrape off paving material and spray cleaning
solvent or release agent on the wearplate,
extensions, and any other area that has been in
contact with the paving material. Cleaning should
be performed while the paver is hot.
2. Remove any debris from screed and check for
leaks.
3. Lubricate the required parts. (Pages 5-4 and 5-5)
4. Check light bulbs and replace if needed.
5. Check battery cables and connections.
6. Check coolant level. Fill if needed.
7. Check for loose, worn or damaged hoses, tubes
clamps. Tighten, repair or replace promptly.
8. Keep the fuel tank full to prevent condensation.
Always ll at the end of the day.
9. Check engine oil level. (Page 5-17)
10. Check hydraulic oil level. (Page 5-19)
11. Perform any other engine preventive maintenance
described in the Engine Operator’s Manual.
Every 50 Hours or Weekly
Routine Maintenance
1. Check air lter. (Page 5-18)
2. The FIRST 50 HOURS, change engine oil and lters,
then every 250 hours thereafter. (Page 5-17)
3. Check all battery connections and remove any
corrosion present.
4. Check torque hub oil level. Relle if needed. (Page
5-5)
5. Lubricate grease ttings on the ight screw on both
sides of the screed, the tting on the depth screw,
and the ttings on the ange bearings located on top
of the extension screed. Grease nuts on extension
screws. (Pages 5-4 and 5-5)
6. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.
Every 100 Hour or Monthly
Maintenance
1. Check main engine belt. Replace if needed.
2. Check and adjust conveyor drive chains. (Page
5-8)
3. Check and adjust conveyor ight chains. (Page 5-7)
4. Check auger drive chains, lubricate and adjust.
(Page 5-9)
5. Check and adjust screed extension top guide.
(Page 5-9)
6. Perform previous routine maintenance and any
other engine preventive maintenance described in
the Engine Operator’s Manual.

Table of Contents

Related product manuals