Installation...Unpacking the machine
1-8
LTO
1.1 UNPACKING THE MACHINE
1.1.1 WARNING
Ensure that the machine is placed in accordance with the TOP and BOTTOM signs on the box.
Place the machine on a flat and stable surface.
1.1.2 PROCEDURE
Follow the steps below to unpack the machine:
Flow chart 1-1: Unpacking the machine
#1 Place the machine on the floor in its packing with the help of another person.
#2 Cut the two straps on the main packaging carton.
#3 Pull the main packaging carton upwards and remove it.
#4 Cut the adhesive tape on the second carton.
#5 Check that the accessories (case and tubes) have been supplied and
keep them close to the machine.
#6 Pull the second packaging carton upwards and remove it.
#7 Remove the 4 fixing screws from the rails on the pallet.
#8 Remove the plastic protection from the machine.
#9 With the help of a second person, lift the machine by the rails and place it on
the work bench.
#10 Keep the packaging cartons. We advise you to store them flat.