EasyManua.ls Logo

Maeda MC285CB-3 - Crane Operation Position; Motor Speed Operation; Travelling Operation Unit (Only When Travelling)

Maeda MC285CB-3
256 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4 CRANE OPERATION Mini-Crawler Crane M A E D A
4-62 9/2020 MC285CB-3
Crane Operation Position
Use the crane operation position procedure when
switching operations after performing the
procedure in Before Crane Operationon page
4-61.
1. Move the winch lever (3) to the DOWN (push
forward) position and lower the hook until
anti-two block is not detected, but do not let
the hook block touch the ground.
Fig. 4-155
2. Move the boom lift lever (4) to the RAISE (pull
toward you) position and raise the boom to an
angle where the hook block is not
over-wound and not touching the ground.
Fig. 4-156
Fig. 4-157
Motor Speed Operation
WARNING! Tip Hazard. Do not operate the
crane at high speeds. Decrease the speed at
the beginning or near the end of an operation.
Change the speed to low or high according to
the load.
NOTICE: The motor speed can be adjusted by
using the travelling operation unit when travelling,
by using the monitor during crane and outrigger
operation, and by using the radio remote control
transmitter when operating under radio remote
control.
Travelling operation unit (only when
travelling)
Operate the motor speed adjuster dial as follows:
MIN: Turning the dial counterclockwise (to the
left) reduces the motor speed.
MAX: Turning the dial clockwise (to the right)
increases the motor speed.
Fig. 4-158
NOTICE: Release your hand from the dial once
the motor speed has increased to that required for
the task. The dial will remain at that position.

Table of Contents

Related product manuals